Crude oil oil field in Niger. ~20 kb/d before the export pipeline; ~69 kb/d average exports May 2024–May 2026 (50.3 Mbbl) plus ~20 kb/d to Soraz (derived); capacity 110 kb/d

Origin: Niger

Region: Diffa

Site data

  • Commodity: Crude oil
  • Tier: Tier 1 (03 Resources Map tier rule)
  • Status: Producing: Producing and exporting, with repeated interruptions
  • Operator / ownership: CNPC (China) operator; Niger state via SONIDEP; export through WAPCO (CNPC subsidiary, 15% Niger)
  • Production: ~20 kb/d before the export pipeline; ~69 kb/d average exports May 2024–May 2026 (50.3 Mbbl) plus ~20 kb/d to Soraz (derived); capacity 110 kb/d
  • Coordinates: 15.3000, 13.3300 (Koulélé CPF: OSM pipeline start 15.34,13.28 + Nominatim Koulélé 15.28,13.40; USGS field point 15.94,12.89)

Security context

  • Feb 2025: two CNPC employees were kidnapped and two gendarmes killed in an ambush near the field (ISSP suspected, no claim). Jul 2024: CNPC suspended construction for security reasons.
  • Rebel sabotage campaign: the FPL (Jun–Jul 2024) and its offshoot MPLJ (Nov 2025 – Feb 2026, including a 10 Feb 2026 attack the army says it repelled) target the oil sector to cut the junta’s revenue; see Niger oil pipeline attacks (2024-26). The FPL sits in the CFLN coalition noted under FAN (Niger).
  • Mar 2025: Niger expelled the local heads of CNPC, WAPCO and Soraz. Copernicus measured a methane leak of >40 t/h at Agadem.

Sources

Relationships

Referenced by

Media

Zoom D: Agadem block and the Niger–Benin export pipeline (Niger leg).